Retaining Wall Project - AlUla
The project required careful coordination due to its proximity to heritage assets. We delivered excavation, structural works, and finishing within 10 days using controlled sequencing, continuous supervision, and site-protection measures.
Infrastructure Project - AlUla
Work included grading, compaction, base-layer reinforcement, and paving. Dust-control measures and traffic management reduced impact and ensured safe access throughout execution.
Street Civil Works - AlUla
The scope covered site leveling, asphalt works, and reorganizing parking areas to reduce congestion and improve visibility. All works were delivered to technical standards while respecting site conditions.
RCU Facility Offices Project - AlUla
We converted a former staff residential area into a functional open workspace for the facilities team, aligning with RCU design standards and improving team coordination.